Experiment setup:
The experiment was carried out in a commercial farm in the Thadiq near RIYADH using a med-tech fiberglass greenhouse (Picture 1). The area of the greenhouse is 5000 m2, with 130 m length and 38 m width. Greenhouse height from the middle 5.30 m and from the side 2.70 m. The greenhouse consists of 10 units, the cultivated area of each unit is 468 m2 (Table 1). In this greenhouse, a pad and fan automated cooling system was used. Two thermometers were installed. Half of the fans start automatically running when the inside air temperature is above 24oC and the other half of the fans start when the inside air temperature is above 28oC.
Picture1. Med-Tech Fiberglass Greenhouse Commercial Farm, Thadiq, Riyadh
Table 1: Greenhouse description and planting density
GH Length |
130m |
No. of rows per unit |
13 |
GH width |
38m |
No. of plants per row |
1404 |
GH area |
5000 m2 |
No. of plants per row |
1404 |
GH side height |
270 cm |
Plant density |
3 Plants/m2 |
GH mid-height |
530cm |
Plant spacing within rows |
35 cm |
Plant wire height |
250 cm |
Spacing between rows |
100cm |
No. of units per GH |
10 |
Temp. A set point 50% fans running |
24 |
Planting unit size |
13*36 m |
Temp. B set point for the rest 50% fans |
28 c |
Planting unit area |
468 m2 |
No. of workers per greenhouse |
2.5 |
Cucumber seed (Al-Farid) from Rijk Zwaan was sown directly inside the greenhouse on the 1st of June 2020. The experiment was done using 5 units out of 10. Table (2) present the layout of the experiment. For high-wire and umbrella system using two stems, seedlings top cut was done after the appearance of the fourth true leaves on 16th June 2020 to allow two new axillary buds to grow from the second and the third leaf base (Picture 2). Table 3 showed the important dates of this trial.
Table 2: Experiment Layout inside the Greenhouse
Unit No. |
Crop |
Variety |
Treatments |
Remarks |
1 |
Cucumber |
|
|
|
2 |
Cucumber |
|
|
|
3 |
Cucumber |
|
|
|
4 |
Cucumber |
|
|
|
5 |
Cucumber |
Al-Farid |
Umbrella system |
One stem |
6 |
Cucumber |
Al-Farid |
High-wire |
Two stems |
7 |
Cucumber |
Al-Farid |
Umbrella system |
Two stems |
8 |
Cucumber |
Al-Farid |
Umbrella system |
One stem |
9 |
Cucumber |
Al-Farid |
High-wire |
Two stems |
10 |
Cucumber |
|
|
|
Table 3. Field Trial Important Dates
Activity |
Umbrella System One stem |
Umbrella System Two stems |
High-wire System Two stems |
Direct seed sowing |
01-June-2020 |
01-June-2020 |
01-June-2020 |
Top cut to have two stems |
|
16-June-2020 |
16-June-2020 |
First harvest |
06-July-2020 |
06-July-2020 |
06-July-2020 |
Last Harvest |
15-August-2020 |
15-August-2020 |
28-September-2020 |
Crop cycle from seed sowing (Days) |
76 |
76 |
120 |
Picture 2: Cucumber plants inside the Greenhouse, Left - Direct Seeding and Right - Seedlings top cutting on June 16 to initiate two lateral stems.
Water Analysis and Fertilizer Recommendation
pH |
6.06 |
EC (ds.m-1) |
0.057 |
TDS (mg/L) |
36.5 |
Ca (mg/L) |
1.5 |
Mg (mg/L) |
0 |
Na (mg/L) |
10.9 |
K (mg/L) |
0.3 |
HCO3−1 (mg/L) |
2.6 |
Cl (mg/L) |
13.8 |
S (mg/L) |
5.1 |
NO3 (mg/L) |
< 0.5 |
According to water analysis, the following startup and production stage fertilizer recommendation was prepared by Estidamah fertigation expert.
Fertilizer Recommendation for Startup Stage as prepared by Estidamah Fertigation Expert.
Fertilizer Recommendation for Production Stage of Cucumber Growth as prepared by Estidamah Fertigation Expert.
Goals
Testing a new cropping system called a high-wire system in comparison to the traditional Umbrella system
The main factors studied are:
- High-Wire Cucumber Growing System in Med-Tech Glasshouse at the commercial farm in comparison to Umbrella system
Result overview
Total cucumber yield of the high-wire growing system was greater by 20% than that of the umbrella system.
The cucumber fruit harvest was started on the 6th of July 2020. Results showed that, within the first 3 weeks of harvest, the yield of the Umbrella growing system using one stem without top cutting (5.15 kg/m2) was higher than the umbrella system using two stems and top cutting (3.17 kg/m2) and the high-wire system using two stems and top cutting (2.26 kg/m2) (Table 7). These results indicated that top cutting caused the delay in cucumber harvesting for about 3 weeks when using direct field seeding. Furthermore, these results showed that about 51% of the total yield in umbrella system without top cutting was harvested in the first three weeks, while with top cutting, 31% of the total yield was harvested when using umbrella system and only 15% of the total yield was harvested when using high wire system (Table 7).
During the summer growing season, the harvesting period for the traditional umbrella system using one or two stems did not exceed seven weeks (50 days), and the plants had almost dried (Picture 3 A), while when using the high-wire system, the harvesting period can last for 14 weeks (100 days) under such growing conditions without any symptoms of plant drying (Picture 3 B).
Our results showed that the harvesting yield from week 4 to 7 was about 49% of the total yield in umbrella system using one stem and 69% when using umbrella system and two stems, while it formed only 36% of the total yield when using high-wire and two stems (Table 7). This indicates that using a high-wire system provides constant yield production all over the harvesting period compared to an umbrella system.
Figure 2. Weekly production (kg/m2) of cucumber plants grown by three growing systems at the commercial farm, 2020.
Table 7: Weekly and Total cucumber yield using three growing systems at the Commercial Farm 2020.
Weeks of Harvest |
Umbrella System 1 stem |
Umbrella System 2 stems |
High-wire 2 stems |
1 |
2.13 |
0.98 |
0.85 |
2 |
1.77 |
1.02 |
0.96 |
3 |
1.25 |
1.17 |
0.45 |
4 |
1.63 |
2.38 |
1.84 |
5 |
1.17 |
1.54 |
1.14 |
6 |
1.15 |
1.69 |
1.45 |
7 |
0.94 |
1.42 |
1.02 |
8 |
0.00 |
0.00 |
1.91 |
9 |
0.00 |
0.00 |
0.99 |
10 |
0.00 |
0.00 |
0.97 |
11 |
0.00 |
0.00 |
0.95 |
12 |
0.00 |
0.00 |
0.92 |
13 |
0.00 |
0.00 |
0.92 |
14 |
0.00 |
0.00 |
0.77 |
Total Yield (kg/m2) |
10.04 |
10.19 |
15.13 |
Weeks (1-3)% of total yield |
51 |
31 |
15 |
Weeks (4-7)% of total yield |
49 |
69 |
36 |
High-wire increased harvesting period (85 days) as compared to Umbrella (41 days), and also improved class A fruits up to 89%
The results of the accumulated yield for the three growing systems showed that the yield of the umbrella system (one or two stems) was greater than that of the high-wire system in the first 8 weeks of harvest (Fig.3), while starting from week 9, the accumulated yield of the high-wire system was greater than that of umbrella system because the plants of umbrella system had dried and no further production from these two treatments was obtained.
Figure 3. Accumulated Yield of three growing systems at the commercial farm. 2020.
Total Cucumber Yield
The total cucumber yield of the high-wire growing system was greater than that of the umbrella system. The average total yield of the high-wire system was 15.13 kg/m2, while for umbrella system using one stem was 10.04 kg/m2 and for umbrella system using two stems was 10.19 kg/m2. Results showed that the high-wire system increased yield by 49 to 51-% as compared to the umbrella system using two stems or one stem, respectively (Table 8).
Results also showed that water-use efficiency ranged from 92.0 l/kg for the umbrella system to 97.8 l/kg for the high-wire system (Table 8). Energy and labor costs (SAR/m2/crop cycle) were also higher when using the high-wire system compared to the umbrella system because of the long crop cycle (Table 8).
Table 8: Total Yield, Water Use Efficiency, Energy and Worker costs of cucumber plants when grown in three growing systems.
Item |
Umbrella 1 stem |
Umbrella 2 stems |
High-wire 2 stems |
Growing cycle (Days) |
76 |
76 |
120 |
Harvesting period (Days) |
41 |
41 |
85 |
No. of harvest |
21 |
21 |
43 |
Average yield (kg/m2) |
10.04 |
10.19 |
15.13 |
Average plant yield (kg/plant) (3 plants/m2) |
3.35 |
4.00 |
5.04 |
Total irrigation water (l per m2) |
312.3 |
312.3 |
493.1 |
Total cooling water (l per m2) |
624.7 |
624.7 |
986.3 |
Total water consumption (l/m2) |
937.0 |
937.0 |
1479.4 |
Water-Use Efficiency (l/kg) |
93.3 |
92.0 |
97.8 |
Energy cost (SAR/m2/ crop cycle) |
0.92 |
0.92 |
1.41 |
Labor cost (SAR/m2/crop cycle |
2.69 |
2.69 |
4.14 |
Fruit Yield Classification
Harvested fruits in nine harvesting dates from the three growing systems were used to classify fruit yield quality. For each growing system, the fruit was separated by the grower into three classes:
- Class A: Fruit weight 90-100 g, 12-14 cm length, 3 cm diameter, uniform fruit shape.
- Class B: Fruit weight around 80-100 g. 12-14 cm length irregular fruit shape.
- Class C: Fruit weight Above 120 g, 15 cm length, and/or 3.5 cm diameter.
The description and photo for each class are presented in table (9)
Table 9: Harvested fruit classification from High-wire and Umbrella systems (Data average of 9 harvest dates)
The results showed that using a high-wire system improve class A yield (56.6% of the total yield) as compared with an umbrella system (45.2%) (There were no differences between umbrella systems using one or two stems regarding fruit quality), while class B yield was not strongly affected by the growing system (Table 10). On the other hand, Class C yield was reduced by a high-wire system (12.5% from total yield) as compared with an umbrella system (23.1%).
Table 10: Fruit yield classification according to farmer practices (data average of nine harvesting dates).
|
Class A Good Fruit |
Class B Irregular Fruit Shape |
Class C Big Size Fruit |
Total |
Umbrella system |
4.54 |
3.18 |
2.32 |
10.04 |
Umbrella system |
45.20% |
31.80% |
23.10% |
100% |
High-wire system |
8.56 |
4.68 |
1.89 |
15.13 |
High-wire system |
56.60% |
30.90% |
12.50 |
100% |
Avg. price per Box (10 kg) in SAR |
32 |
14 |
12 |
|
Avg. price per Kg (SAR) |
3.2 |
1.4 |
1.2 |
|
Total Selling Price (SAR/m2) |
|
|
|
|
Umbrella system |
14.5 |
4.45 |
2.78 |
21.77 |
High-wire system |
27.4 |
6.55 |
2.27 |
36.21 |
Conclusions
- According to the results of this trial, cucumber yield (kg/m2) was improved by 49 to 51-% when using a high-wire system as compared with an umbrella system using two stems or one stem, respectively (Table 8).
- The harvesting period was doubled by a high-wire system as compared with an umbrella system (from 41 to 85 days) (Table 8).
- Fruit quality was also improved by increasing the percent of class A yield up to 89%, and class C yield was decreased by 19% when using high wire as compared with the umbrella system (Table 10).
- Total cucumber fruit selling price per m2 was improved by 66% when using a high-wire system as compared with an umbrella system.
- Using a high-wire system and two stems per plant (Top cut) in direct seeding practices delay fruit harvest by 3 weeks as compared with a single stem (no top cut).
- In summer (June) cucumber greenhouse cultivation, 50% of total fruit yield produced in the first 3 weeks when using umbrella system, while when using high wire system 15% of total yield was produced in the first 3 weeks. These results indicate that using a high-wire system fruit harvesting was more stable with time than an umbrella system.
Recommendations
In order to have a better result, we recommend the following:
- Doing the same experiment on another planting date (less temperature).
- Practice a high-wire training system in a complete greenhouse (all greenhouse areas).
- Allocate small size greenhouse for seedling production to avoid extra operation cost 5000m2 greenhouses.